[GeoNetwork-devel] Date of the metadata: Can I change it from <gco:DateTime> to <gco:Date>?

Dear Sir / Madam,

I use Geonetwork version 2.10.0
And I have the same problem like another Geonetwork user:
http://osgeo-org.1560.x6.nabble.com/Date-of-the-metadata-Can-I-change-it-from-lt-gco-DateTime-gt-to-lt-gco-Date-gt-td3860659.html

I have a problem with the date for the metadata. The GeoNetwork editor saves the date and time when a metadata has been saved automatically.
Here an example of the Metadata-Date as supported by GeoNetwork:

gmd:dateStamp
gco:DateTime2011-02-01T13:01:35</gco:DateTime>
</gmd:dateStamp>

But aqccording to INSPIRE Implementing Rules it has to look like this:

gmd:dateStamp
gco:Date2011-02-01</gco:Date>
</gmd:dateStamp>

Is there any chance I can change the automatism from GeoNetwork that it only writes down the gco:Date instead of the gco:DateTime?

Thanks in advance.

Best Regards,
Rob Aalberts

···

--------------------------------------
<small><big>**Geodan**
President Kennedylaan 1
1079 MB Amsterdam (NL)

T +31 (0)20 - 5711 311
E rob.aalberts@anonymised.com
</big></small><small><big><small><big>[www.geodan.nl](http://www.geodan.nl/) | [disclaimer](http://www.geodan.nl/disclaimer)</big></small></big></small>
--------------------------------------