[Geoserver-devel] GeoNode: do not enable wms resource limits??

Hi,
I stumbled upon the GeoNode suggestions for configuring GeoServer and this one
made me fall off the chair:

  • Don’t set the “Resource Consumption Limits.” This sounds a bit counterintuitive, but these limits are implemented in an inefficient way such that unless resource-intensive requests are common on your server it is more efficient to avoid the limits. A better implementation of this feature is available for GeoServer 2.1 and will be incorporated in GeoNode 1.1.
    Uh? The resource limits are implemented in a rather efficient way as far as I know.

What is the statement above referring to in particular?

Cheers
Andrea

==
Our support, Your Success! Visit http://opensdi.geo-solutions.it for more information.

Ing. Andrea Aime

@geowolf
Technical Lead

GeoSolutions S.A.S.
Via Poggio alle Viti 1187
55054 Massarosa (LU)
Italy
phone: +39 0584 962313
fax: +39 0584 1660272
mob: +39 339 8844549

http://www.geo-solutions.it
http://twitter.com/geosolutions_it