There is still time for last minuet fixes
Let me know if testing turns up anything that will delay the release train.
--
Jody Garnett
There is still time for last minuet fixes
Let me know if testing turns up anything that will delay the release train.
--
Jody Garnett
On Thu, Aug 29, 2013 at 2:16 AM, Jody Garnett <jody.garnett@anonymised.com>wrote:
There is still time for last minuet fixes
Let me know if testing turns up anything that will delay the release train.
I believe there are a bunch of issues that need to be fixed before
releasing a final:
* https://jira.codehaus.org/browse/GEOS-6000, which results in GS inability
to serve further requests in some cases (not totally clear to me what the
ingredients to trigger this issue are)
* http://jira.codehaus.org/browse/GEOS-5985, which is a no go for windows
users (I should be able to fix this one today or tomorrow)
* http://jira.codehaus.org/browse/GEOS-5975, which prevents using the CSS
extention under java 6, tried to get David attention on this one but
failed, we can either decide to drop the extension from the release or
build manually a new version that is java 6 compatibile, imho releasing
with an extension that does not work with the only officially supported JDK
is not an option
Cheers
Andrea
Ing. Andrea Aime
@geowolf
Technical Lead
GeoSolutions S.A.S.
Via Poggio alle Viti 1187
55054 Massarosa (LU)
Italy
phone: +39 0584 962313
fax: +39 0584 1660272
mob: +39 339 8844549
http://www.geo-solutions.it
http://twitter.com/geosolutions_it
-------------------------------------------------------
Just a question, will it be an other RC or the final 2.4.0 Release? I’d like to announce the upcoming release at Transifex, that Team can finish the translations.
Please correct me if I’m wrong, should the page http://geoserver.org/display/GEOS/GeoTools+and+GeoServer+release+schedule be updated to show the current schedule plans or does exists an other page for new 2.4 stable and 2.5 lates releases (in addition top GeoTools releases)
2013/8/29 Andrea Aime <andrea.aime@anonymised.com…>
On Thu, Aug 29, 2013 at 2:16 AM, Jody Garnett <jody.garnett@anonymised.com> wrote:
Learn the latest–Visual Studio 2012, SharePoint 2013, SQL 2012, more!
Discover the easy way to master current and previous Microsoft technologies
and advance your career. Get an incredible 1,500+ hours of step-by-step
tutorial videos with LearnDevNow. Subscribe today and save!
http://pubads.g.doubleclick.net/gampad/clk?id=58040911&iu=/4140/ostg.clktrk
Geoserver-devel mailing list
Geoserver-devel@anonymised.comsts.sourceforge.net
https://lists.sourceforge.net/lists/listinfo/geoserver-devel
There is still time for last minuet fixes
Let me know if testing turns up anything that will delay the release train.
I believe there are a bunch of issues that need to be fixed before releasing a final:
Cheers
Andrea
–
Ing. Andrea Aime
@geowolf
Technical Lead
GeoSolutions S.A.S.
Via Poggio alle Viti 1187
55054 Massarosa (LU)
Italy
phone: +39 0584 962313
fax: +39 0584 1660272
mob: +39 339 8844549
http://www.geo-solutions.it
http://twitter.com/geosolutions_it
On Thu, Aug 29, 2013 at 9:04 AM, Frank Gasdorf
<fgdrf@anonymised.com>wrote:
Just a question, will it be an other RC or the final 2.4.0 Release? I'd
like to announce the upcoming release at Transifex, that Team can finish
the translations.Please correct me if I'm wrong, should the page
http://geoserver.org/display/GEOS/GeoTools+and+GeoServer+release+schedule be
updated to show the current schedule plans or does exists an other page for
new 2.4 stable and 2.5 lates releases (in addition top GeoTools releases)
We'll update that page, but we can do so only when 2.4.0 final is out.
Right now we have the above issues that
we need to debate (do we go out with final, or with RC2?) and a user could
still report a blocker (although imho
GEOS-6000 is enough of one already)
Cheers
Andrea
Ing. Andrea Aime
@geowolf
Technical Lead
GeoSolutions S.A.S.
Via Poggio alle Viti 1187
55054 Massarosa (LU)
Italy
phone: +39 0584 962313
fax: +39 0584 1660272
mob: +39 339 8844549
http://www.geo-solutions.it
http://twitter.com/geosolutions_it
-------------------------------------------------------
I assume until these issues are not fixed we will get an other RC otherwise a final Release, right?
Jody, does “going out next week” indicates you will make it this weekend?
2013/8/29 Andrea Aime <andrea.aime@anonymised.com…>
On Thu, Aug 29, 2013 at 9:04 AM, Frank Gasdorf <fgdrf@anonymised.com> wrote:
Just a question, will it be an other RC or the final 2.4.0 Release? I’d like to announce the upcoming release at Transifex, that Team can finish the translations.
Please correct me if I’m wrong, should the page http://geoserver.org/display/GEOS/GeoTools+and+GeoServer+release+schedule be updated to show the current schedule plans or does exists an other page for new 2.4 stable and 2.5 lates releases (in addition top GeoTools releases)
We’ll update that page, but we can do so only when 2.4.0 final is out. Right now we have the above issues that
we need to debate (do we go out with final, or with RC2?) and a user could still report a blocker (although imho
GEOS-6000 is enough of one already)
Cheers
Andrea
–
Ing. Andrea Aime
@geowolf
Technical Lead
GeoSolutions S.A.S.
Via Poggio alle Viti 1187
55054 Massarosa (LU)
Italy
phone: +39 0584 962313
fax: +39 0584 1660272
mob: +39 339 8844549
http://www.geo-solutions.it
http://twitter.com/geosolutions_it
On Thu, Aug 29, 2013 at 10:30 AM, Frank Gasdorf <fgdrf@anonymised.com
wrote:
I assume until these issues are not fixed we will get an other RC
otherwise a final Release, right?
Even if we fix them all, imho we should ask around some opinions about how
invasive the fixes
are, and if they warrant another RC as a result.
Btw, updated pull request for GEOS-5985 here:
https://github.com/geoserver/geoserver/pull/310
Jody, does "going out next week" indicates you will make it this weekend?
Officially it should go out Sept 2nd
Cheers
Andrea
Ing. Andrea Aime
@geowolf
Technical Lead
GeoSolutions S.A.S.
Via Poggio alle Viti 1187
55054 Massarosa (LU)
Italy
phone: +39 0584 962313
fax: +39 0584 1660272
mob: +39 339 8844549
http://www.geo-solutions.it
http://twitter.com/geosolutions_it
-------------------------------------------------------
I agree that we should fix these all but also think the changes are non trivial enough to warrant another RC.
For 6000 do we have someone looking into it? Christian?
On Thu, Aug 29, 2013 at 6:19 AM, Andrea Aime <andrea.aime@anonymised.com> wrote:
On Thu, Aug 29, 2013 at 10:30 AM, Frank Gasdorf <fgdrf@anonymised.com> wrote:
Learn the latest–Visual Studio 2012, SharePoint 2013, SQL 2012, more!
Discover the easy way to master current and previous Microsoft technologies
and advance your career. Get an incredible 1,500+ hours of step-by-step
tutorial videos with LearnDevNow. Subscribe today and save!
http://pubads.g.doubleclick.net/gampad/clk?id=58040911&iu=/4140/ostg.clktrk
Geoserver-devel mailing list
Geoserver-devel@anonymised.comsts.sourceforge.net
https://lists.sourceforge.net/lists/listinfo/geoserver-devel
–
Justin Deoliveira
OpenGeo - http://opengeo.org
Enterprise support for open source geospatial.
I assume until these issues are not fixed we will get an other RC otherwise a final Release, right?
Even if we fix them all, imho we should ask around some opinions about how invasive the fixes
are, and if they warrant another RC as a result.
Btw, updated pull request for GEOS-5985 here:
https://github.com/geoserver/geoserver/pull/310
Jody, does “going out next week” indicates you will make it this weekend?
Officially it should go out Sept 2nd
Cheers
Andrea
–
Ing. Andrea Aime
@geowolf
Technical Lead
GeoSolutions S.A.S.
Via Poggio alle Viti 1187
55054 Massarosa (LU)
Italy
phone: +39 0584 962313
fax: +39 0584 1660272
mob: +39 339 8844549
http://www.geo-solutions.it
http://twitter.com/geosolutions_it
We did not have a volunteer to make additional release candidates. If everyone likes I can delay a week before making 2.4.0 in order to give time for the above issues to be fixes.
Frank I assume you would like to translate now (against a nightly build) so any translations are included in the 2.4.0 release?
On Thu, Aug 29, 2013 at 6:30 PM, Frank Gasdorf <fgdrf@anonymised.com> wrote:
I assume until these issues are not fixed we will get an other RC otherwise a final Release, right?
Jody, does “going out next week” indicates you will make it this weekend?
- Frank
2013/8/29 Andrea Aime <andrea.aime@anonymised.com>
On Thu, Aug 29, 2013 at 9:04 AM, Frank Gasdorf <fgdrf@anonymised.com> wrote:
Just a question, will it be an other RC or the final 2.4.0 Release? I’d like to announce the upcoming release at Transifex, that Team can finish the translations.
Please correct me if I’m wrong, should the page http://geoserver.org/display/GEOS/GeoTools+and+GeoServer+release+schedule be updated to show the current schedule plans or does exists an other page for new 2.4 stable and 2.5 lates releases (in addition top GeoTools releases)
We’ll update that page, but we can do so only when 2.4.0 final is out. Right now we have the above issues that
we need to debate (do we go out with final, or with RC2?) and a user could still report a blocker (although imho
GEOS-6000 is enough of one already)
Cheers
Andrea
–
Ing. Andrea Aime
@geowolf
Technical Lead
GeoSolutions S.A.S.
Via Poggio alle Viti 1187
55054 Massarosa (LU)
Italy
phone: +39 0584 962313
fax: +39 0584 1660272
mob: +39 339 8844549
http://www.geo-solutions.it
http://twitter.com/geosolutions_it
I’d like to contribute translations back for the following languages because these were completed recently for the stable release branch (2.4.x):
I guess I can make it till Sunday night this week. Please could you please delay for an other week? Please correct me if I’m wrong but we are talking about the 2.4.x branch where stable release will be build from?
Thanks
2013/8/30 Jody Garnett <jody.garnett@anonymised.com>
We did not have a volunteer to make additional release candidates. If everyone likes I can delay a week before making 2.4.0 in order to give time for the above issues to be fixes.
Frank I assume you would like to translate now (against a nightly build) so any translations are included in the 2.4.0 release?
On Thu, Aug 29, 2013 at 6:30 PM, Frank Gasdorf <fgdrf@anonymised.com> wrote:
I assume until these issues are not fixed we will get an other RC otherwise a final Release, right?
Jody, does “going out next week” indicates you will make it this weekend?
- Frank
2013/8/29 Andrea Aime <andrea.aime@anonymised.com>
On Thu, Aug 29, 2013 at 9:04 AM, Frank Gasdorf <fgdrf@anonymised.com> wrote:
Just a question, will it be an other RC or the final 2.4.0 Release? I’d like to announce the upcoming release at Transifex, that Team can finish the translations.
Please correct me if I’m wrong, should the page http://geoserver.org/display/GEOS/GeoTools+and+GeoServer+release+schedule be updated to show the current schedule plans or does exists an other page for new 2.4 stable and 2.5 lates releases (in addition top GeoTools releases)
We’ll update that page, but we can do so only when 2.4.0 final is out. Right now we have the above issues that
we need to debate (do we go out with final, or with RC2?) and a user could still report a blocker (although imho
GEOS-6000 is enough of one already)
Cheers
Andrea
–
Ing. Andrea Aime
@geowolf
Technical Lead
GeoSolutions S.A.S.
Via Poggio alle Viti 1187
55054 Massarosa (LU)
Italy
phone: +39 0584 962313
fax: +39 0584 1660272
mob: +39 339 8844549
http://www.geo-solutions.it
http://twitter.com/geosolutions_it
Yes. The next stable release will be from 2.4.x - it appears from this email thread that we have a number of issues to fix so I will delay the release. The latest I can delay is until September 10th, any later and we will miss FOSS4G.
On Fri, Aug 30, 2013 at 5:55 PM, Frank Gasdorf <fgdrf@anonymised.com> wrote:
I’d like to contribute translations back for the following languages because these were completed recently for the stable release branch (2.4.x):
- Korean,
- Dutch,
- Spanish and
- German
I guess I can make it till Sunday night this week. Please could you please delay for an other week? Please correct me if I’m wrong but we are talking about the 2.4.x branch where stable release will be build from?
Thanks
- Frank
2013/8/30 Jody Garnett <jody.garnett@anonymised.com>
We did not have a volunteer to make additional release candidates. If everyone likes I can delay a week before making 2.4.0 in order to give time for the above issues to be fixes.
Frank I assume you would like to translate now (against a nightly build) so any translations are included in the 2.4.0 release?
On Thu, Aug 29, 2013 at 6:30 PM, Frank Gasdorf <fgdrf@anonymised.com> wrote:
I assume until these issues are not fixed we will get an other RC otherwise a final Release, right?
Jody, does “going out next week” indicates you will make it this weekend?
- Frank
2013/8/29 Andrea Aime <andrea.aime@anonymised.com>
On Thu, Aug 29, 2013 at 9:04 AM, Frank Gasdorf <fgdrf@anonymised.com> wrote:
Just a question, will it be an other RC or the final 2.4.0 Release? I’d like to announce the upcoming release at Transifex, that Team can finish the translations.
Please correct me if I’m wrong, should the page http://geoserver.org/display/GEOS/GeoTools+and+GeoServer+release+schedule be updated to show the current schedule plans or does exists an other page for new 2.4 stable and 2.5 lates releases (in addition top GeoTools releases)
We’ll update that page, but we can do so only when 2.4.0 final is out. Right now we have the above issues that
we need to debate (do we go out with final, or with RC2?) and a user could still report a blocker (although imho
GEOS-6000 is enough of one already)
Cheers
Andrea
–
Ing. Andrea Aime
@geowolf
Technical Lead
GeoSolutions S.A.S.
Via Poggio alle Viti 1187
55054 Massarosa (LU)
Italy
phone: +39 0584 962313
fax: +39 0584 1660272
mob: +39 339 8844549
http://www.geo-solutions.it
http://twitter.com/geosolutions_it
Jody,
you’re talking about delays rather casually, and yet the time boxed release procedures
were put in place to avoid delays to start with, the procedure we voted says “a release
every 2 weeks until no more blockers are found”, it does not say “in time for FOSS4G at
all costs”.
You should officially ask for a delay, and/or see if there is going to be someone ready
to make 2.4.0 (or an RC3) Sept 18th (not everybody is going to be at FOSS4G)
Possibly in a separate thread, this one has become too deep.
On Fri, Aug 30, 2013 at 2:03 PM, Jody Garnett <jody.garnett@anonymised.com> wrote:
Yes. The next stable release will be from 2.4.x - it appears from this email thread that we have a number of issues to fix so I will delay the release. The latest I can delay is until September 10th, any later and we will miss FOSS4G.
–
Ing. Andrea Aime
@geowolf
Technical Lead
GeoSolutions S.A.S.
Via Poggio alle Viti 1187
55054 Massarosa (LU)
Italy
phone: +39 0584 962313
fax: +39 0584 1660272
mob: +39 339 8844549
http://www.geo-solutions.it
http://twitter.com/geosolutions_it
On Fri, Aug 30, 2013 at 5:55 PM, Frank Gasdorf <fgdrf@anonymised.com> wrote:
I’d like to contribute translations back for the following languages because these were completed recently for the stable release branch (2.4.x):
- Korean,
- Dutch,
- Spanish and
- German
I guess I can make it till Sunday night this week. Please could you please delay for an other week? Please correct me if I’m wrong but we are talking about the 2.4.x branch where stable release will be build from?
Thanks
- Frank
2013/8/30 Jody Garnett <jody.garnett@anonymised.com>
We did not have a volunteer to make additional release candidates. If everyone likes I can delay a week before making 2.4.0 in order to give time for the above issues to be fixes.
Frank I assume you would like to translate now (against a nightly build) so any translations are included in the 2.4.0 release?
On Thu, Aug 29, 2013 at 6:30 PM, Frank Gasdorf <fgdrf@anonymised.com> wrote:
I assume until these issues are not fixed we will get an other RC otherwise a final Release, right?
Jody, does “going out next week” indicates you will make it this weekend?
- Frank
2013/8/29 Andrea Aime <andrea.aime@anonymised.com>
On Thu, Aug 29, 2013 at 9:04 AM, Frank Gasdorf <fgdrf@anonymised.com> wrote:
Just a question, will it be an other RC or the final 2.4.0 Release? I’d like to announce the upcoming release at Transifex, that Team can finish the translations.
Please correct me if I’m wrong, should the page http://geoserver.org/display/GEOS/GeoTools+and+GeoServer+release+schedule be updated to show the current schedule plans or does exists an other page for new 2.4 stable and 2.5 lates releases (in addition top GeoTools releases)
We’ll update that page, but we can do so only when 2.4.0 final is out. Right now we have the above issues that
we need to debate (do we go out with final, or with RC2?) and a user could still report a blocker (although imho
GEOS-6000 is enough of one already)
Cheers
Andrea
–
Ing. Andrea Aime
@geowolf
Technical Lead
GeoSolutions S.A.S.
Via Poggio alle Viti 1187
55054 Massarosa (LU)
Italy
phone: +39 0584 962313
fax: +39 0584 1660272
mob: +39 339 8844549
http://www.geo-solutions.it
http://twitter.com/geosolutions_it
I’ve had a fix for GEOS-5975 sitting on GeoScript master for a while, yesterday I finally took the time to update the maven repo and refresh the dependency on the GeoServer side. Ironically the problem arose from the one .java file in all of GeoScript Scala.
It would be nice if someone could grab the latest nightlies and confirm the fix, but I think the issue can be closed now.
On Thu, Aug 29, 2013 at 2:26 AM, Andrea Aime <andrea.aime@anonymised.com> wrote:
On Thu, Aug 29, 2013 at 2:16 AM, Jody Garnett <jody.garnett@anonymised.com> wrote:
There is still time for last minuet fixes
Let me know if testing turns up anything that will delay the release train.
I believe there are a bunch of issues that need to be fixed before releasing a final:
Cheers
Andrea
–
Ing. Andrea Aime
@geowolf
Technical Lead
GeoSolutions S.A.S.
Via Poggio alle Viti 1187
55054 Massarosa (LU)
Italy
phone: +39 0584 962313
fax: +39 0584 1660272
mob: +39 339 8844549
http://www.geo-solutions.it
http://twitter.com/geosolutions_it
Thinking, well I am happy to make a release at the appointed time next week. I understood we were short of volunteers last meeting.
I will start a new thread.
On Fri, Aug 30, 2013 at 10:07 PM, Andrea Aime <andrea.aime@anonymised.com> wrote:
Jody,
you’re talking about delays rather casually, and yet the time boxed release procedures
were put in place to avoid delays to start with, the procedure we voted says “a release
every 2 weeks until no more blockers are found”, it does not say “in time for FOSS4G at
all costs”.You should officially ask for a delay, and/or see if there is going to be someone ready
to make 2.4.0 (or an RC3) Sept 18th (not everybody is going to be at FOSS4G)Possibly in a separate thread, this one has become too deep.
On Fri, Aug 30, 2013 at 2:03 PM, Jody Garnett <jody.garnett@anonymised.com> wrote:
Yes. The next stable release will be from 2.4.x - it appears from this email thread that we have a number of issues to fix so I will delay the release. The latest I can delay is until September 10th, any later and we will miss FOSS4G.
–
Ing. Andrea Aime
@geowolf
Technical Lead
GeoSolutions S.A.S.
Via Poggio alle Viti 1187
55054 Massarosa (LU)
Italy
phone: +39 0584 962313
fax: +39 0584 1660272
mob: +39 339 8844549
http://www.geo-solutions.it
http://twitter.com/geosolutions_it
On Fri, Aug 30, 2013 at 5:55 PM, Frank Gasdorf <fgdrf@anonymised.com> wrote:
I’d like to contribute translations back for the following languages because these were completed recently for the stable release branch (2.4.x):
- Korean,
- Dutch,
- Spanish and
- German
I guess I can make it till Sunday night this week. Please could you please delay for an other week? Please correct me if I’m wrong but we are talking about the 2.4.x branch where stable release will be build from?
Thanks
- Frank
2013/8/30 Jody Garnett <jody.garnett@anonymised.com>
We did not have a volunteer to make additional release candidates. If everyone likes I can delay a week before making 2.4.0 in order to give time for the above issues to be fixes.
Frank I assume you would like to translate now (against a nightly build) so any translations are included in the 2.4.0 release?
On Thu, Aug 29, 2013 at 6:30 PM, Frank Gasdorf <fgdrf@anonymised.com> wrote:
I assume until these issues are not fixed we will get an other RC otherwise a final Release, right?
Jody, does “going out next week” indicates you will make it this weekend?
- Frank
2013/8/29 Andrea Aime <andrea.aime@anonymised.com>
On Thu, Aug 29, 2013 at 9:04 AM, Frank Gasdorf <fgdrf@anonymised.com> wrote:
Just a question, will it be an other RC or the final 2.4.0 Release? I’d like to announce the upcoming release at Transifex, that Team can finish the translations.
Please correct me if I’m wrong, should the page http://geoserver.org/display/GEOS/GeoTools+and+GeoServer+release+schedule be updated to show the current schedule plans or does exists an other page for new 2.4 stable and 2.5 lates releases (in addition top GeoTools releases)
We’ll update that page, but we can do so only when 2.4.0 final is out. Right now we have the above issues that
we need to debate (do we go out with final, or with RC2?) and a user could still report a blocker (although imho
GEOS-6000 is enough of one already)
Cheers
Andrea
–
Ing. Andrea Aime
@geowolf
Technical Lead
GeoSolutions S.A.S.
Via Poggio alle Viti 1187
55054 Massarosa (LU)
Italy
phone: +39 0584 962313
fax: +39 0584 1660272
mob: +39 339 8844549
http://www.geo-solutions.it
http://twitter.com/geosolutions_it
On Fri, Aug 30, 2013 at 3:46 PM, David Winslow <dwinslow@anonymised.com> wrote:
I've had a fix for GEOS-5975 sitting on GeoScript master for a while,
yesterday I finally took the time to update the maven repo and refresh the
dependency on the GeoServer side. Ironically the problem arose from the
one .java file in all of GeoScript Scala.It would be nice if someone could grab the latest nightlies and confirm
the fix, but I think the issue can be closed now.
Just did so, looking good. I believe the patch for the pom files was still
not ported
to the 2.4.x branch, or was it?
Btw, any news about these pull requests?
https://github.com/dwins/geoscript.scala/pulls
Cheers
Andrea
Ing. Andrea Aime
@geowolf
Technical Lead
GeoSolutions S.A.S.
Via Poggio alle Viti 1187
55054 Massarosa (LU)
Italy
phone: +39 0584 962313
fax: +39 0584 1660272
mob: +39 339 8844549
http://www.geo-solutions.it
http://twitter.com/geosolutions_it
-------------------------------------------------------
From translation teams point of view we are fine after several commits for Korean, German, Spanish and Dutch properties files.
Thank you for your attention
I’ve had a fix for GEOS-5975 sitting on GeoScript master for a while, yesterday I finally took the time to update the maven repo and refresh the dependency on the GeoServer side. Ironically the problem arose from the one .java file in all of GeoScript Scala.
It would be nice if someone could grab the latest nightlies and confirm the fix, but I think the issue can be closed now.
Just did so, looking good. I believe the patch for the pom files was still not ported
to the 2.4.x branch, or was it?
Btw, any news about these pull requests?
https://github.com/dwins/geoscript.scala/pulls
Cheers
Andrea
–
Ing. Andrea Aime
@geowolf
Technical Lead
GeoSolutions S.A.S.
Via Poggio alle Viti 1187
55054 Massarosa (LU)
Italy
phone: +39 0584 962313
fax: +39 0584 1660272
mob: +39 339 8844549
http://www.geo-solutions.it
http://twitter.com/geosolutions_it
On Sat, Aug 31, 2013 at 3:18 PM, Frank Gasdorf <frank.gasdorf@anonymised.com>wrote:
From translation teams point of view we are fine after several commits for
Korean, German, Spanish and Dutch properties files.
Thank you for your attention
And thank you and all the translation teams for all the hard work
Cheers
Andrea
Ing. Andrea Aime
@geowolf
Technical Lead
GeoSolutions S.A.S.
Via Poggio alle Viti 1187
55054 Massarosa (LU)
Italy
phone: +39 0584 962313
fax: +39 0584 1660272
mob: +39 339 8844549
http://www.geo-solutions.it
http://twitter.com/geosolutions_it
-------------------------------------------------------