Hi,
I spent some time looking at jira today and found a number of tickets that were
supposed to be closed (work completed on trunk in time for the beta releases)
and were not.
In particular, I’ve marked as resolved something like 25 tickets in GeoServer
and 4-5 in GeoTools.
I’m not pointing fingers, a fair number of those were tickets that I should
have closed myself, but we should be, generally speaking, more careful about
that, otherwise our changelogs, and as a result, the release blogs and
general communication towards the user base, is going to suffer
Cheers
Andrea
–
==
GeoServer Professional Services from the experts! Visit
http://goo.gl/NWWaa2 for more information.
==
Ing. Andrea Aime
@geowolf
Technical Lead
GeoSolutions S.A.S.
Via Poggio alle Viti 1187
55054 Massarosa (LU)
Italy
phone: +39 0584 962313
fax: +39 0584 1660272
mob: +39 339 8844549
http://www.geo-solutions.it
http://twitter.com/geosolutions_it